Rhino Resources Prov Drilling Campaign Update on PEL 85, Offshore Namibia

Source: Rhino Resources

Rhino Resources Ltd provides the following update, on behalf of the PEL85 JV, regarding its operated drilling campaign on Block 2914, offshore Orange Basin, Namibia.

The Sagittarius 1-X well, which spud on 18 December 2924 using the Noble Venturer drillship, reached TD on 6th February 2025.

The well penetrated Upper Cretaceous targets and interjected a hydrocarbon reservoir, with no observed water contact.

Intensive wireline logging operations allowed for the collection of hydrocarbon samples and sidewall cores. Fluid and reservoir properties will be confirmed with laboratory analysis.

The drilling operations on the Sagittarius-1X well have now concluded and the rig has moved to drill the second well in the programme (Capricornus) which will test a different fairway

Commenting on the initial well results, Rhino’s CEO Travis Smithard said:
“We are pleased to have safely and successfully completed the drilling of the first exploration well in our programme on PEL 85. The hydrocarbon-bearing reservoir encountered is evidence for the effectiveness of charge, although further assessment will be required by Rhino and the PEL 85 JV partners to evaluate the results of the well.

Our attention now turns to the second target in the programme, which is the Capricornus prospect, a NE-SW trending channel system. The Capricornus-1X well is due to be spud within the next 24 hours and is estimated to take 47 days to drill”.

If you would like to be updated on the latest Namibia oil and gas news, visit www.namibiaoilandgas.com

admin
Author: admin

Managing the Namibia Oil and Gas Platform

Byadmin

Managing the Namibia Oil and Gas Platform

Leave a Reply

Your email address will not be published. Required fields are marked *